For higher-risk building projects, Gateway One and Gateway Two (Building Safety Act) are important regulatory points at different stages of the design and construction process. Gateway One sits within the planning process – and requires fire safety considerations to be addressed through a fire statement – while Gateway Two is the point at which the Building Safety Regulator must approve the proposed building work before construction can begin.
Many make the mistake of viewing this as simply a paperwork exercise, but our experienced fire engineers are clear: the quality of what is submitted, and therefore whether a smooth process and approval can be expected, depends on the work that happens well before the application itself. This is because fire safety is not the responsibility of one person or discipline. Architects, structural and services engineers, contractors, building owners, and, in some cases, multiple fire engineers may all have a role to play. Ensuring all these people are working from the same understanding of the fire strategy – and resolving differences before they become embedded in the design – is key to building a solid application that can withstand scrutiny.
The Checkmate Fire team gets involved early in the process to work through drawings with the design team and help make sure everyone understands what the fire strategy means for their part of the building. This might mean resolving a clash between disciplines, challenging a detail that we are concerned may not work on site, or developing the technical information needed for the application. For Gateway Two, we help bring this together into the detailed, coordinated information needed to demonstrate compliance, including the relevant fire and emergency information.