Above and Beyond
A lot of Salix Homes buildings were erected pre-1990’s, meaning asbestos was discovered on a continual basis. Because all our operatives are asbestos trained, we were able to work with specialists to ensure the safe and efficient eradication of asbestos.
Identifying additional issues once we were inside the roof space, we ensured all changes to programme were identified and fed back to the client quickly and efficiently.
With full tenant cooperation essential to the project’s success, we worked closely with EW, who organised letter drops, phone calls, and full resident liaison. Working reactively to the residents’ timescales, we worked flexibly to accommodate all stakeholders.
Sourcing materials during the pandemic also posed a challenge. With the client insistent on only using Rockwool products, we bought everything in bulk before Christmas 2020 to mitigate any potential material shortages in the future.
Benefits provided
Completing all jobs on time and to budget – with consideration taken for Covid programme adjustments – we have forged a solid relationship with Emanuel Whittaker.
Ensuring Compliance for over 30 high rise and multi-storey buildings, all our works have been delivered on time and to budget, securing repeat business with the client and developing a strong relationship.